Admin


Professionals Free Trial Unique Features

How to achieve Part L1A Compliance

From the 6th of April 2014, it will be mandatory that new guidelines for design and construction compliance with Part L1A are implemented. Foresite have developed an online design and building control system that will guarantee that these new guidelines are implemented correctly.

Design Compliance:

The design software presents good design options for each design element of Part L1A specification, the software is interfaced with an approved SAP 2012 and proves if the design decisions made are compliant, if non-compliant the software advises on compliance.

From the 6th of April 2014, it will be mandatory that the design documentation, calculations and drawings generated by the Foresite software is presented to the building control department before work commences.

Construction Compliance:

The Foresite on-line building control system is an on-line inspection plan and quality control system that keeps all the registered stakeholders informed, the software generates customised fabric & fixed building compliance documents that will guarantee onsite compliance.

From the 6th of April 2014, it will be mandatory that the assessor signs off on Part L1A compliance, and that the signed off compliance documents generated by the Foresite quality control system and used by the assessor to calculate the as constructed EPC are presented to building control body when the project is completed.

© Copyright Foresite 2012. | Designed by Spintech IT ltd. | login