Admin


How Foresite designs a Part L1A specification.

The design professional should draw the project to sketch stage showing internal dimensions, ceiling heights, position and dimensions of windows and the orientation of the building on the site, he should not complete the working drawings with sections until he has designed the fabric using the Foresite system. Only when the fabric design has been completed with design floor depths, wall depths, and roof depths should the working drawings and sections be completed.

The designer sends the drawings to us at tech@foresitebuildingcontrol.co.uk and we will give a fixed price for designing a compliant Part L1A specification. If a price is agreed the designer sets up a project on their administration page answering the seven questions method of construction, typical details and how the building is to be insulated and we will do the rest.

When the designer has paid the agreed fee using PayPal we will transfer the project over to your administration page.

© Copyright Foresite 2012. | Designed by Spintech IT ltd. | login